Wiring of the 25 way way D-sub connector; this is the bus which will go between different 19 inch rack units. This finishes off the Control Unit (except for production of an actual front panel to replace the 3 mm foam board mock up...)
By the way, heatshrink cable markers indispensable in keeping some sort of order in the wiring...
By the way, heatshrink cable markers indispensable in keeping some sort of order in the wiring...
Next tasks: production of a batch of four integrator / sum boards (to go in Integrator Unit) and production of the Coefficient Attenuators Unit (mainly pots and switches)...(each of these units will be on the bus).